In a mission critical facility, it’s important we ensure that all elements of the design and each individual piece of equipment will operate as designed and required under full load and in failure scenarios. This is why we recommend IST testing.
IST testing before the handover of the project
Focus on the testing of the relationship of all critical equipment
Resilience and redundancy tests
Testing of equipment failure in emulated scenarios
Maximum design load testing on entire infrastructure including distribution paths
Concurrent maintainability and fault tolerance testing
Emulation of actual sever heat/airflow output
Rectification any discrepancies
Tests using rack mountable (where racks are in situ) or floor standing load emulators