Our expertise in designing and building data centres includes projects within unusual and sometimes inaccessible buildings and locations.
In these cases, cranes can’t simply arrive, pick up the equipment, and lift it into place. Every step requires meticulous planning, starting with close collaboration with the client and with the size and weight of the equipment to be removed or installed.
Precise planning of the moving equipment’s orientation and where the crane can reside during the lift is critical for a successful lift, as these factors also dictate the required reach.
Additional planning is necessary if the client does not own land to park the crane, as this could result in road closures, particularly in city centre locations.

Even after the crane is parked in position, it can take up to eight hours to build and get it ready to begin a lift, with consideration for what road protection is also needed, as the weight of the crane could cause damage, so it is essential to spread the load over a large area.
These photographs show several recent projects, all of which required cranes to deliver cooling equipment. One was in a busy city centre location, another within a live working environment with over 1,000 on-site employees, and a third in a multi-storey listed building.
With up to 10 staff on-site on the day of the lift, the ground and room teams need to have open communication when the lift is in progress.

Once the project is finished, the crane breakdown can take an additional six hours.
Get in touch to discuss the logistical challenges involved in your data centre or comms room project.

